List of Last 5 (Five) Years We have completed works of Public Works Department of Pabna District.

Serial No. Work Name Division
1. Construction of 20 storied Residential Building with 20 storied foundation of 6 unit each floor (1250 sft each unit) under the project of Ruppur Nuclear Power Plant (Civil, Internal Sanitary, Internal Electrical and Installation of Gas Line) Building No.-01 Pabna PWD Division
2. Construction of 20-storied 1250 sft Residential Building (6-unit per floor)at Ruppur Nuclear Power Plant Housing Area, Ishwardi, Pabna. (Building No- 01)(SUB -HEAD :-Supply & Installation of 1600KVA Electric Sub-Station Equipment; Supply & Installation of 2 Nos 500 KVA Generator; Supply & Installation of 02 Nos 1000 Kg 20 stop Lift; Supply & installation Air -Cooler.; On grid Solar -Panel System, Surge Protection System, CCTV System, Fire hydrant& Protection System, Wi-Fi Internet System and Cable TV Network, Supplying & Installation of Centrifugal and submersible Pump Motor Set etc); Pabna PWD Division
3. Construction of 20-storied 850 sft Residential Building (6-unit per floor) at Ruppur Nuclear Power Plant (Building No- 03) (SUB -HEAD :-Supply & Installation of 1000KVA Electric Sub-Station Equipment; Supply & Installation of 2 Nos 400 KVA Generator; Supply & Installation of 01 Nos 1000 Kg 20 stop Lift and 01 Nos 800 Kg 20 stop Bed Lift Supply & installation Air -Cooler.; On grid Solar -Panel System, Surge Protection System, CCTV System, Fire Hydrant System, Wi-Fi Internet System and Supplying & Installation of Centrifugal and submersible Pump Motor Set etc) Work. Financial 2016-2017. Pabna PWD Division
4. Construction of 20 Storied Residential Building with 20 Storied Foundation Six Unit in Each Floor 850 sft Each Unit Under the Project Construction of Rooppur Nuclear Power Plant (Sub Hed Remaining Work of Building No- 3-6.3 in/c Civil Sanitary and E/M Works with other ancillary Household Works). Pabna PWD Division
5. Construction of 20-storied 1250 sft Residential Building (6-unit per floor)at Ruppur Nuclear Power Plant Housing Area, Ishwardi, Pabna. (Building No- 01)(SUB -HEAD :-Supply & Installation of 1600KVA Electric Sub-Station Equipment; Supply & Installation of 2 Nos 500 KVA Generator; Supply & Installation of 01 Nos 1000 Kg 20 stop Lift and 01 Nos 800 Kg 20 stop Bed Lift; Supply & installation Air -Cooler.; On grid Solar -Panel System, Surge Protection System, CCTV System, Fire hydrant System, Wi-Fi Internet System and Supplying & Installation of Centrifugal Pump Motor Set etc). Pabna PWD Division
6. Construction of newly Bituminous Internal Road Works of at Muladuli, CSD Food Godown. Pabna PWD Division
7. Construction of 6 (six) storied foundation 02 (two) storied Barrack Building at Police line, Pabna including Civil , Sanitary, Under ground water reservoir with distribution line, Internal & External Electrification, Compound drain, Apron, Internal & other ancillary works. During the fy 2012-2013. Pabna PWD Division
8. Construction of chief judicial magistrate Court Building of 64 District Sadar (1st stage) (2nd Stage Correction) One at Pabna, External Electrification Work (supply and Installation of 500 KVA Electric Sub-Station Equipment) Work. Pabna PWD Division
9. Establishment of Four Marine Academies in Bangladesh (Pabna, Barisal, Sylhet and Rangpur) (One at Pabna) (Sub-Head Construction of 8 (Eight) Storied foundation 04 (Four) storied Academic Building (Sub-Head: Civil, Sanitary & Electrification works). Pabna PWD Division
10. Establishment of Four Marine Academies in Bangladesh (Pabna, Barisal, Sylhet and Rangpur) (One at Pabna) (Sub-Head Construction of 6 (Six) Storied foundation 04 (Four) storied 800.00 Sft Quarter Building (Civil, Sanitary & Electrification works). Pabna PWD Division
11. Establishment of Hostel Building for the Visually Impaired Children (37 Units) At Atghoria Pabna. During the FY 2014-2015. Pabna PWD Division
12. Construction of 20 storied Residential Building with 20 storied foundation of 6 unit each floor (1250 sft each unit) under the project of Ruppur Nuclear Power Plant (Civil, Internal Sanitary, Internal Electrical and Installation of Gas Line) Building No.-01. Pabna PWD Division
13. Construction of 100 users living accommodation and conference room cum one guest house under the project of Ruppur Nuclear Power Plant Residential area (Civil, Internal Sanitary, Internal of External Electrification work) for the year 2016-2017. Pabna PWD Division
14. Construction of Guest House with 100 persons accommodation and conference arrangement facilities under the Project Construction of Ruppur Nuclear Power Plant (Sub-Head: Construction of Connecting Road, Supplying Sub-Station, Generator, Wi-Fi Internet System, Split type AC and other household ancillary works.) Pabna PWD Division
15. Construction of Guest House with 100 persons accommodation and conference arrangement facilities under the Project Construction of Ruppur Nuclear Power Plant (Sub-Head: Construction of Connecting Road, Supplying Sub-Station, Generator, Wi-Fi Internet System, Split type AC and other household ancillary works.) Pabna PWD Division
16. Construction of 20 Storied Residential Building With 20 Storied Foundation Six Unit in Each Floor, 1250 Sft Each Unit Under The Project Pabna PWD Division
17. Remaining work (Civil, Sanitary and Electrical) of Up gradation of Nurses Training institutes into Nursing Colleges at Pabna District under the project Operation Plan Named “Physical Facilities Development. Pabna PWD Division
18. Up-gradation of pabna Nurses Training Institute into Nursing Colleges at Pabna District. (Sub-head: Construction of 6 (six) Storied foundation 03(Three) storied Academic & 02(Two) Storied Hostel building (Civil, Sanitary & Electrification works.) Pabna PWD Division
19. Construction of Boundary wall Barbed wire Fencing of Handial Police investigation Center at Chatmohor Police Station in Pabna District. During the Year 2016-2017. Pabna PWD Division
20. Construction of Record Room at First Floor (West Side) of Deputy Commissioners Office Pabna. During the Year 2017-2018. Pabna PWD Division
21. Establishment of Four Marine Academies in Bangladesh (Pabna, Barisal, Sylhet and Rangpur) (One at Pabna). (Sub-Head: Supply Fitting and Fixing Fire Extinguisher at Marine Academy Pabna). During the Year 2016-2017. Pabna PWD Division
22. Construction of internal boundary wall Pabna Medical College Student Hostel. Financial Year 2015-2016. Pabna PWD Division
23. Construction of 20 storied Residential Building with 20 storied Foundation 6 (six) unit in each Floor, 850 sft each unit under the Project Construction of Ruppur Nuclear Power Plant (Sub-Head: Civil, Internal Sanitary, Internal Electrification and Gas Line Connection) Group-1. Pabna PWD Division
24. Construction of Chief Judicial Magistrate Court Building of 64 District Head Quarter in Bangladesh one at Pabna (Sub-Head: Supply and Installation of Fire Hydrant & Protection System) FY 2017-2018. Pabna PWD Division
25. Supply And Installation 800 KVA Sub-Stations Equipments, LT and HT Cables and Other Accessories at Mental Hospital, Pabna. FY 2017-2018. Pabna PWD Division
26. Construction of Armory at Police Lines in Pabna District under the project of Construction of Armory for 19 Districts. Pabna PWD Division
27. Construction of Underground Reservoir Compound Drain Boundary Wall RCC Approach Road Installation of 6 Deep Tube Well Supply and Installation of 300 KVA Electric Substation Equipment 40/60 KVA Generator Compound Light Pump Motor Set Air Conditioner Fire Detection System P.A System Solar Panel of Zillah Shilpakala Academy at Pabna Under Construction of Divisional and Zillah shilpakala Academies. FY 2017-2018. Pabna PWD Division
28. Construction of single storied Union Bhumi Office with 2 storied foundation in/c internal sanitary & internal electrification works under Construction of Union Bhumi Office 6th phase project one at Hadol Union at Faridpur Upazila in Pabna District. Pabna PWD Division
29. Construction of 3 storied Ishwardi Circle ASP Office Cum Quarter Building with Six Storied Foundation at Pabna District(Type-1)(in/c Civil, Sanitary and Internal Electrification). Pabna PWD Division
30. Construction of Upazilla & Union land office 6th Phase one at Bera in the District of Pabna Sub-Head Construction of 2-Storied Building with 4-storied Foundation Upazilla land office including Civil Sanitary Electrification & Ancillary works during the year-2019-2020. Pabna PWD Division
31. Construction of 3 storied farmers training center with 3 storied foundation at Ishwardi upazila of Pabna district under the project of farmers training at the upazila level for transfer of technology 3rd phase. Pabna PWD Division
32. Construction of 4 storied Sadar Circle ASP Office Cum Quarter Building with Six Storied Foundation at Pabna District Type-1 in/c Civil Sanitary and Internal Electrification. Pabna PWD Division
33. Vertical extension of 37 District Circuit Houses in Bangladesh. 1 One at Pabna including Civil Sanitary Electrification & Ancillary work under PWD Division Pabna. Financial Year-2018-2019. Pabna PWD Division
33. Supply and installation of 500KVA electric sub-station to supply emergency electricity of 250 bed General Hospital Pabna. FY 2018-19. Pabna PWD Division
34. Construction of Fire Service & Civil Defense Station building Civil internal sanitary internal electrification works including kitchen deep tube well underground water reservoir compound road boundary wall fuel shed external electrification and solar panel at Santhia Pabna under Establishment of Fire Service & Civil Defense Stations in 156 important Upazilla/Places of the Country. FY 2017-2018. Pabna PWD Division
35. Modernization of Agriculture Information Service and Digital agriculture information and communication strengthening project. Sub-Head Vertical Extension of First Floor Over existing Ground Floor of Pabna Agricultural extension Office. Pabna PWD Division
36. Vertical extension of Pabna PWD Office building first floor over existing ground floor for accommodating new Pabna PWD Circle office in/c Civil sanitary & E/M Works. FY 2018-19. Pabna PWD Division
37. Establishment of Four Marine Academics in Bangladesh (Pabna, Barishal, Sylhet and Rangpur) (One at Pabna). (Sub-head Construction of 6(Six) Storied Foundation 04(four) storied 600.00 Sft. Quarter Building (Civil, Sanitary & Electrification works.). Pabna PWD Division
38. Supplying of Sub-mersible Pump motor set for Police super Residence, Sadar Police Rest House at pabna. Pabna PWD Division
39. Establishment of Four Marine Academics in Bangladesh (Pabna, Barishal, Sylhet and Rangpur) (One at Pabna). (Sub-head Construction of 2(Two)) Storied Foundation 01(One) storied Commandant Residential Building (Civil, Sanitary & Electrification works.) Pabna PWD Division
40. Establishment of Four Marine Academics in Bangladesh (Pabna, Barishal, Sylhet and Rangpur) (One at Pabna). (Sub-head Construction of 6(Six)) Storied Foundation 04(Four) storied 1000.00 Sft. Quarter Building (Civil, Sanitary & Electrification works.) Pabna PWD Division
41. Construction of 60 Investigation Centres in type plan for Police Department in Different Places of Bangladesh (One at Handial of Chatmohor Upazila under Pabna District). Pabna PWD Division
42. Up-gradation of Pabna Textile Institute to Pabna Textile Engineering College (Sub-head: Construction of 6 (Six Storied Foundation 02 (two) storied Boys Hostel at Pabna including Civil, sanitary, Internal Electrification & other ancillary works). Pabna PWD Division
43. Pabna Textile Engineering College of Renovation, Expansion, Remodeling of Rooms, Drains, Main Gate, Shahidminar etc. (Sub-head:- Providing Facing brick and 125 thick brick and Klinker paving brick works in floor or pavement in floor and drip course on existing miner). During the year 2014-2015. Pabna PWD Division
44. Construction of 60 Investigation Centres in type plan for Police Department in Different Places of Bangladesh (One at Handial of Chatmohor Upazila under Pabna District). (Sub-head: Internal, External Electrification Works). Pabna PWD Division
45. Establishment of Nursing Institute at Pabna. (Sub-head: Construction of Six storied Foundation 3 (Three) storied Academic & Administrative Building & Two storied Hostel Building in/c Civil, Sanitary, Internal Electrification Work). During the year 2014-2015. Pabna PWD Division
46. Establishment of Forty Technical Training Center TTC at Upazilla Level and 01 Institute of Marine Technology at Chittagong. One TTC at Sujanagar Pabna.(Civil, Sanitary, Internal Electrification, Deep Tube well, Underground Water Reservoir, Supplying Generator, Sub Station, Air Conditioner, Pump Motor, Solar panel, Fire Extinguisher etc.) FY 2017-2018. Pabna PWD Division
47. Construction of 20 Storied Residential Building with 20 Storied Foundation Six Unit in Each Floor 1250 sft Each Unit Under the Project Construction of Rooppur Nuclear Power Plant. Subhed Remaining Work of Building No- 2-(5a.5) in/c Civil Sanitary and E/M Works with other ancillary Household Works. Pabna PWD Division
48. Construction of 20 Storied Residential Building with 20 Storied Foundation Six Unit in Each Floor 1250 sft Each Unit Under the Project Construction of Rooppur Nuclear Power Plant. Sub-hed Remaining Work of Building No- 5a.7 in/c Civil Sanitary and E/M Works with other ancillary Household Works. Pabna PWD Division
49. External Electrification works (Supplying and Installation of 1600 KVA Electrical Sub-station equipment, 02 Nos 500-KVA Generator, 01 No 1000 Kg 16 Stop Passenger Lift and 01 No 1000 Kg 16 Stop Bed Lift, Air-Cooler, Solar panel, Surge Protection, CC TV, Fire hydrant, WI-FI Internet System and Centrifugal pump motor set) for Construction of 16 storied Residential building (Building No.14) with 1250 sft area 6 unit in each floor under the Rooppur Nuclear Power Plant project (FY- 2016-2017). Pabna PWD Division
50. External Electrification works (Supplying and Installation of 1600 KVA Electrical Sub-station equipment, 02 Nos 500-KVA Generator, 01 No 1000 Kg 16 Stop Passenger Lift and 01 No 1000 Kg 16 Stop Bed Lift, Air-Cooler, Solar panel, Surge Protection, CC TV, Fire hydrant, WI-FI Internet System and Centrifugal pump motor set) for Construction of 16 storied Residential building (Building No.08) with 1250 sft area 6 unit in each floor under the Rooppur Nuclear Power Plant project (FY- 2016-2017). Pabna PWD Division
51. External Electrification works (Supplying and Installation of 1600 KVA Electrical Sub-station equipment, 02 Nos 500-KVA Generator, 01 No 1000 Kg 20 Stop Passenger Lift and 01 No 1000 Kg 20 Stop Bed Lift, Air-Cooler, Solar panel, Surge Protection, CC TV, Fire hydrant, WI-FI Internet System and Centrifugal pump motor set) for Construction of 20 storied Residential building (Building No.13) with 1250 sft area 6 unit in each floor under the Rooppur Nuclear Power Plant project (FY- 2016-2017). Pabna PWD Division
52. External Electrification works (Supplying and Installation of 1600 KVA Electrical Sub-station equipment, 02 Nos 500-KVA Generator, 01 No 1000 Kg 20 Stop Passenger Lift and 01 No 1000 Kg 20 Stop Bed Lift, Air-Cooler, Solar panel, Surge Protection, CC TV, Fire hydrant, WI-FI Internet System and Centrifugal pump motor set) for Construction of 20 storied Residential building (Building No.16) with 1250 sft area 6 unit in each floor under the Rooppur Nuclear Power Plant project (FY- 2016-2017). Pabna PWD Division
53. Establishment of National Science & Technology Complex Building. (1st Revised) (2-Basement & 13-Storied Building having 13-storied Foundation) (Sub-head- Supply Installation, Testing & Commission of Fire Detection & Protection System) (21/17-18). Pabna PWD Division