<h4>We have completed various works under Padma Oil Company Ltd. under Bangladesh Petroleum Corporation, given below.</h4>
<ol>
<li style=”list-style-type: none;”>
<ol>
<li style=”padding-bottom: 20px; text-align: justify;”>Design, Engineering, Supply, Installation, Testing and Commissioning of IP Based CCTV System at Sreemangle Depot.</li>
<li style=”padding-bottom: 20px; text-align: justify;”>RCC Approach Road From Siddirgonj-Narayangonj Road towards Godenail Depot, Narayangonj (Approximately Eight Hundred Feet)”</li>
<li style=”padding-bottom: 20px; text-align: justify;”>Design, Engineering, Supply, Installation, Testing and Commissioning of Fire Hydrant Type Fire Fighting Package and Associated Works at Godenail Depot.</li>
<li style=”padding-bottom: 20px; text-align: justify;”>Design, Engineering, Supply, Installation, Testing and Commissioning of Fire Hydrant Type Fire Fighting System at Daulatpur Depot.</li>
<li style=”padding-bottom: 20px; text-align: justify;”>Installation of Jet A-1 Delivery Line from Pump House to New Filling Shed at Godenail Depot.</li>
<li style=”padding-bottom: 20px; text-align: justify;”>Supply, Installation, Testing and Commissioning of 01 (One) No. 500 KVA Sub-Station at Parbatipur Depot.</li>
<li style=”padding-bottom: 20px; text-align: justify;”>Supply, Installation, Testing and Commissioning of 01 (One) No. 400 KVA and 01 (One) No. 100 KVA Diesel Engine Driven Generator at Parbatipur Depot.</li>
</ol>
</li>
</ol>